NYCT “SANDY” RECOVERY PROJECT CRANBERRY TUBE REHABILITATION
Out of gallery
Project Details
-
Contract Value: $50M
-
Completion Date: 2017
-
Location: Brooklyn & Manhattan, NY
-
Scope of Work:
-
Removal and replacement of the positive and negative traction power cables powering the third rail system
-
Replacement and mitigation of the power equipment in the DC circuit breaker house and substation, antenna system (Fiber Optic and Copper cable), communication system and emergency alarm/emergency telephone systems
-
Restoration and mitigation to two fan plants and two pump rooms, and reconstruction of electrical duct bank within the bench wall system
-
Upgrades to NYCT signal system
-