NYCT CONSTRUCTION OF SUBSTATIONS AT CLIFTON AND NEW DORP IN STATEN ISLAND
Out of gallery
Project Details
-
Contract Value: $40M
-
Completion Date: Ongoing
-
Location: Staten Island, NY
-
Scope of Work:
-
Fabricate and install two pre-engineered power substations at two separate stations (Clifton and New Dorp), within the Staten Island Railroad System (SIRTOA)
-
New electrical services for each location, bringing ConEd high-tension and low-tension services to these substations, consisting of new under-ground electrical duct banks and manholes
-
New positive and negative traction power cables installed to power the third rail systems
-
Signal system integration and communication system upgrades
-