NYCT CONSTRUCTION OF SUBSTATION AT TWO LOCATIONS IN STATEN ISLAND

Project Details​

  • Contract Value: $37,733,000

  • Completion Date: Ongoing

  • Location: Staten Island, NY

  • Scope of Work:

    • Fabricate and install two pre-engineered power substations at two separate stations (Clifton and New Dorp), within the Staten Island Railroad System (SIRTOA)

    • New electrical services for each location, bringing ConEd high-tension and low-tension services to these substations, consisting of new under-ground electrical duct banks and manholes

    • New positive and negative traction power cables installed to power the third rail systems  

    • Signal system integration and communication system upgrades